Table of Contents
PPT Slide
Contents
Operational Philosophy
PPT Slide
Operational Phases
Ground System Requirements Summary
Ground System Requirements Summary
Ground System Requirements Summary
Verification Approach
EO-1 Operations Testing Status
PPT Slide
Requirements Verification
Requirements Verification
PPT Slide
PPT Slide
PPT Slide
S/C to MOC Testing(1 of 2)
S/C to MOC Testing(2 of 2)
Simulations
PPT Slide
PPT Slide
MOC Hardware Status
MOC Procedure Status
Launch
Space Network &Ground Network Coverage
Launch Day Orbit Ground Trace
Highlights of L&EO
Highlights of L&EO
L&EO Organization
Documentation Philosophy
PPT Slide
PPT Slide
S/C User’s Guide Status
Mission Procedures Document
PPT Slide
SOMO Institutional Mission Operations
RFA Status
Critical RFA Status
Critical PR
PPT Slide
PPT Slide
Simulation Summary
Simulation Summary
Simulation Summary
Simulation Summary
Simulation Summary
Subsystems Exercised with Contingencies
PPT Slide
Contingency Procedures
Contingency Procedures
STOL Contingency Procedures
STOL Contingency Procedures (continued)
STOL Contingency Procedures (continued)
Decision Trees
Decision Trees
Critical PRs and RFAsAddressed in This Section
PPT Slide
Ampex Recorder Status
PPT Slide
On-Board Protections
Operations Plans
Operations Plans (continued)
PPT Slide
FOT Training
FOT Training
S/C Training Status as of 3-8-00
Ground Training Status as of 3-8-00
PPT Slide
Functional FOT Organization
FOT Experience (Core)
FOT Experience (Supplementing L&EO)
FOT Experience (Supplementing L&EO)
FOT Shift Profile
FOT Shift Support – Week 1
FOT Shift Support – Week 2 to L+60
FOT Shift Support – Normal Ops (w/ Automation)
FOT Staffing Conclusion
PPT Slide
Landsat-7 / EO-1 Interface
Landsat-7 / EO-1 Flight Dynamics Planning
Landsat-7 / EO-1 Co-Imaging
Landsat-7 / EO-1 Interface Validation
|