Contents

Reaction Control System

EO-1 RCS Performance Requirements

Verification Matrix

Accumulated Power On Time for EO-1 S/C & Components

RCS Verification Matrix Items

RCS Component Verification

RCS Verification at Primex

RCS Checks at Swales

RCS Environmental Test Program

RCS Thermal Control (1)

RCS Thermal Control (2)

RCS Pressure Transducer Calibration

RCS Internal Leak Check

RCS Pressure Cycle Log

Technical Peer Reviews

PSR RFA Status

RFA #14.17

RFA #14.27

RFA #14.28

Failure Free Operation Time

RCS Launch Site Procedure Status

RCS Ground Support Equipment Status

RCS Statement of Readiness

Problem Records and Residual Risk

PPT Slide

Thruster Valve Leakage

Thruster Valve Leakage

Thruster Valve Leakage