PPT Slide
Contents
System Block Diagram
Power System Block Diagram
Verification Matrix
Accumulated Power On Time for EO-1 S/C & Components
Box Level I&T Process Flow(SAI-PLAN-130)
Remaining Work to be Done
Remaining Work to be Done (continued)
Critical RFAs(not dealt with in other topics)
Status of Open Actions
Residual Risk
Launch Readiness
Review of MAP PRs for Relevance to EO-1
Residual Risk & Effects Due to MAP PRs
MAP PRs Relating to EO-1
MAP PRs Relating to EO-1 (2)
MAP PRs Relating to EO-1 (3)
Nadir Deck Short Circuit
EO-1 Power Distribution Block Diagram
EO-1 Power Services
Fusing Considerations
Fusing Decision Process Matrix
Summary Actions
Fuse Plug Design
Fuse Plug Construction
LVPC Fuse Plug Verification Summary
Summary
Overview of Problem
Initial Inspection Results
Inboard Panel Inspections Results by TECSTAR
Outboard Panel Inspection Results by TECSTAR
TECSTAR Process Assessment
TECSTAR Conclusion
Mechanical Assessment
Thermal Assessment
Assess On-Orbit Performance Value AssumingWorst Case Bonded Value (35%)
Conclusions
List of Assumptions
Contingency Operations
Battery SOC through Sun Acquisition
Worst Case Battery SOC for Undeployed SA
Additional Considerations
Bounded SOC for Undeployed SA
Oscillatory Starts on HSSR 7110 Switches
Context Diagram
Torquer Bar ±15V Output Variations
Email: trish.johnson@gsfc.nasa.gov
Home Page: ../../Docs-RTR.html
Download presentation source