PPT Slide
Contents
Requirements Analysis
Requirements Verification
Requirements Matrix
Program Constraints
Approach to Systems Engineering
Delegated Responsibilities
Spacecraft Level Risk Management Process
Sample of Monthly Risk Matrix
Management of Critical Resources
EO-1 Mass
EO-1 Power Use
EO-1 Telemetry Bandwidth Use
CM Drawings and I&T Procedures
EO-1 Software CM
Quality Assurance Spacecraft Bus Elements
Quality Assurance Spacecraft Bus ElementsWorkmanship Standards
Quality Assurance Spacecraft Bus ElementsWork Order Authorization (WOA) System
Quality Assurance Spacecraft Bus ElementsProblem Records (PRs) and S/W Problem Test Reports (PTRs)
Quality Assurance Spacecraft Bus ElementsPR Closure Process
Quality Assurance Spacecraft Bus ElementsWOA Status
Quality Assurance Spacecraft Bus ElementsProblem Report Status
Quality Assurance Spacecraft Bus ElementsCritical Problem Reports
Quality Assurance Spacecraft Bus ElementsSummary of Critical PRs as of 3/21/00
Spacecraft Problem Report Statistics from 10/1/99 to 3/20/00
RFA #2.06 Delta Confirmation Review (RFA #6)
Critical PRs not covered in other Sections
Integration & Testing Staff
EO-1 Mission and Subsystem Modes
EO-1 Changes Since Environmental Test
EO-1 Changes Since Environmental Test (continued)
Redundancy on EO-1
Built-In Redundancy that Contributes to Graceful Degradation
EO-1 S/C Risk Management Process - 1
EO-1 S/C Risk Management Process - 2
Top Risks and Mitigation on EO-1
Email: trish.johnson@gsfc.nasa.gov
Home Page: ../../Docs-RTR.html
Download presentation source