Table of Contents

PPT Slide

Contents

Requirements Analysis

Requirements Verification

Requirements Matrix

Program Constraints

Approach to Systems Engineering

Delegated Responsibilities

Spacecraft Level Risk Management Process

Sample of Monthly Risk Matrix

Management of Critical Resources

EO-1 Mass

EO-1 Power Use

EO-1 Telemetry Bandwidth Use

CM Drawings and I&T Procedures

EO-1 Software CM

Quality Assurance Spacecraft Bus Elements

Quality Assurance Spacecraft Bus Elements Workmanship Standards

Quality Assurance Spacecraft Bus Elements Work Order Authorization (WOA) System

Quality Assurance Spacecraft Bus Elements Work Order Authorization (WOA) System

Quality Assurance Spacecraft Bus Elements Problem Records (PRs) and S/W Problem Test Reports (PTRs)

Quality Assurance Spacecraft Bus Elements PR Closure Process

Quality Assurance Spacecraft Bus Elements WOA Status

Quality Assurance Spacecraft Bus Elements Problem Report Status

Quality Assurance Spacecraft Bus Elements Critical Problem Reports

Quality Assurance Spacecraft Bus Elements

Quality Assurance Spacecraft Bus Elements Summary of Critical PRs as of 3/21/00

Spacecraft Problem Report Statistics from 10/1/99 to 3/20/00

RFA #2.06 Delta Confirmation Review (RFA #6)

Critical PRs not covered in other Sections

Integration & Testing Staff

Integration & Testing Staff

Integration & Testing Staff

Integration & Testing Staff

Integration & Testing Staff

PPT Slide

EO-1 Mission and Subsystem Modes

EO-1 Changes Since Environmental Test

EO-1 Changes Since Environmental Test (continued)

Redundancy on EO-1

Built-In Redundancy that Contributes to Graceful Degradation

EO-1 S/C Risk Management Process - 1

EO-1 S/C Risk Management Process - 2

Top Risks and Mitigation on EO-1