LAC Test Results / Actions
Vibration (Proto-Flight, Module Level):
- OM: Arrays Contacted By LVE; Some Damage to Arrays and LVEs; Wire Bonds Broken on One Array.
- Incorrect Assembly of LVE Mount
- Wire Bonds Repaired on Array
- One LVE Replaced with Flight Spare
- LVE Mount Re-assembled Correctly
- Module Re-vibrated with no Damage
- EM: 1773 Fiber Alignment Cylinder Cracked
- Failure Mode Observed in Other 1773 Interface Applications
- Cylinder Replaced; Module Re-tested with No Damage
- LAC Can Take Data Without 1773 Commands
Vibration (Spacecraft Level): No Damage