Advanced Land Imager (ALI)

4/3/00


Click here to start


Table of Contents

PPT Slide

Advanced Land Imager (ALI)

Advanced Land Imager (ALI)

ALI Block Diagram

ALI Instrument Requirements

Key System Trades and Critical Analyses

Systems Management Approach: Subcontracts

Systems Management Approach: In-House

Resources Allocations

Configuration Management

Management of Test Procedures

Workmanship and Quality Control

Software Test and Verification

Technical Record Keeping

Documentation - 1

Documentation - 2

MIT/LL Technical Staff on ALI Program

ALI Verification Matrix

ALI Environmental Test Guidelines

ALI Design and Testing Philosophy

Box Level Testing

Flight ALI Vibration Testing

Instrument Vibration Testing

Test Results: Mechanical

EO-1 Temperature Limits

ALI Thermal Vacuum Testing

PPT Slide

ALI Spectral Response Functions

Image Reconstruction and Calibration MS Band 1

Focus Test

Solar Calibration

MTF Performance

ALI Dynamic Range and Linearity

ALI SNR Performance

End-to-End Imaging Test

Problem/Failure Reports (1)

PPT Slide

Waivers (1)

Waivers (2)

Critical RFA’s from ALI CDR (5 June 1997)

Critical RFA’s from ALI CDR (5 June 1997)

Critical RFA’s from ALI CDR (5 June 1997)

Critical Problem Reports from S/C I&T

Critical Problem Reports from S/C I&T

Significant Non-Conformances

Configuration Changes During S/C I&T

Action Item Status

Statement of Readiness

PPT Slide

Topics

Objectives of Test

Equipment Setup

Clean Room Setup

Imaging Collimator Layout

Starburst Image

Before and After Images, Close-Up

Image of Focal Plane

Summary

PPT Slide

History of ALI Contamination

ALI Focal Plane Contamination

Detection and Characteristics of Contamination

Characteristics of Contamination

Images of Focal Plane

On-orbit Focal Plane Temperature Profile

On-orbit Decontamination Plan

Summary