PPT Slide
Verification Process Agenda
Environmental Test Approach
Spacecraft Verification Flow
Verification Documentation
Additional S/C Testing
Projected Power On Time
EO-1 Functional and Performance Testing
CPT Design and Description
CPT Sections
Non-CPT System Performance Tests
Baseline CPT
Functional Test
System Testing During Thermal/Vacuum Test
Post-Environmental CPT
Plan for final CPT
Environmental Testing Overview
LV Separation Shock
Vibration Test
Acoustic Test
EMI/EMC Test
Magnetic Survey Test
RF Compatibility Test
Thermal Balance /Thermal Vacuum Test
Thermal Balance Thermal/Vacuum Test
Thermal Balance Thermal Vacuum Test
Thermal Balance / Thermal Vacuum Test
Alignment
Mass Properties
X-Band Phase Array Near Field Test
End-To-End Instrument Test
End-to-End Instrument Test
EMI/EMC Testing RequirementsPrimary Confirmation Review RFA #10 (1.10)
EO-1 EMI/EMC Testing Conclusion
EMI / EMC Waivers
Electrical Testing of Deployables