Simulation Summary
Sim 3: Launch simulation with contingencies (Days 1 & 2) 12/13 & 14/99
- Same scripting as Sim 2 but with contingencies
- 6 planned contingencies, 1 unplanned
Sim 4: science End-To-End simulation, Day 23
- Included ground stations (SGS, AGS and WGS)
- No S/C interface
- Verified command and telemetry interfaces from MOC to all three stations
- Verified the science planning interfaces
- Stations provided
- Tracking data files
- Station status messages
- Standard Autonomous File Server (SAFS) data
- Post pass summaries