Summary of Open Items fromMarch Red Team Review
Results of Timing Correlation Problem (page 33-39 of original presentation)
- Discovered that problem resided in PTP at Ground Stations
- Updating PTP drivers to version 1.49 which resolves problem
Update subsystems exercised with contingencies (page 34-46)
Update testing and development of contingency procedures (page 34-24 and page 34-48)
Update STOL Contingency Procedures testing status (page 34-25 to 34-28)
Update S/C training status (page 34-29)
Update ground training status