Contents

8/17/00


Click here to start


Table of Contents

PPT Slide

Contents

ACS Architecture Block Diagram

“As Run” Verification Matrix

Projected Power On Time

Changes Since Red Team Review

Summary of Open Items from March Red Team Review (1 of 2)

Summary of Open Items from March Red Team Review (2 of 2)

Thermal Vacuum II Test Results

Reaction Wheel Assemblies

RWA Run-up / Coast Down Trend Table

Critical PR Status

ACS Flight Readiness

PPT Slide

AST Interpoint DC/DC Converters Failure Mode

AST Interpoint DC/DC Converters Rework

AST Interpoint DC/DC Converter Rework Conclusion

Other Subsystem DC/DC Converter Rework and Re-Qualification

GPS PCU DC/DC Converter

ACDS DC/DC Converters

Image AST Anomaly

Image AST Anomaly Investigation

Image AST Anomaly Investigation

Differences Between Image & EO-1

Results of Image AST Anomaly and Investigation

What Happens If the AST Fails?

PPT Slide

SIRU Nitrogen Purge - Background

Summary of PDV History

Gyro A PDV Slope Estimate

PDV Trends Since S/C Thermal/Vac

SIRU Return To Spacecraft

Outlook

PPT Slide

RFA 33.33

Summary of Peer Review

Peer Review Action Items