Table of Contents

PPT Slide

Contents

System Block Diagram

Power System Block Diagram

“As Run” Verification Matrix

Projected Power On Time

Changes Since Red Team Review

Changes Since Red Team Review (continued)

Remaining Work To Be Completed

Remaining Work To Be Completed (continued)

Status of Open Actions

Residual Risk “One Time Events” (Redbook Items)

Residual Risk (continued)

Launch Readiness

PPT Slide

Nadir Deck Short Circuit

PPT Slide

Description of Problem

Umbilical Console Block Diagram

Umbilical Command Timeline

Umbilical Command Timeline

Umbilical Recovery Procedure

Summary

PPT Slide

Solar Array Cable Damage

Solar Array Cable Damage

Solar Array Cable Damage

Solar Array Cable Damage Close-up

Solar Array Cable Damage

Solar Array Cable Damage

Bay 4 View of SADA

Bay 4 View of SADA

Solar Array Cable Damage

Solar Array Cable Damage

Connector Bracket Assembly Fitcheck on Spacecraft Monday 6/12/00 - 1400

Summary